Public Safety and Transportation Operations Center
Our project involved the installation of antennas and coaxial cables on the roof of the newly completed PSTOC, and 96 antennas and coaxial cables on the monopole. Five cables ran to the top mounted antennas, and the monopole received runs to each platform antenna mounting location. All work was performed by hand with a rope and pulley, to decrease the likelihood of damage to the other coaxial cables.
The custom antenna mounts and cable brackets were all delivered to the customer on site by USTS, and the top of the pole was rigged to a small gin-pole to enable access to the four platforms. Multiple coaxial cables were pulled through complex conduits from the radio rooms to the roof, and into the monopole. The tower was analyzed according to ANSI/TIA-222-G standards, and took 8 months to complete.
Specifications:
Capabilities Applied/Processes | Pulling multiple coax cables through complex conduits from the radio rooms to the roof and into the monopole. |
---|---|
Equipment Used on the Monopole | All work was pre-formed by hand with a rope and pulleys to eliminate the risk of damaging the other coax. |
Construction Methods | The pole was rigged at the top to a small gin-pole to access the four platforms and top. Some conduits were lined with "MAXCELL" to accommodate additional coax. |
Logistics | All materials and tools were delivered to the customer on site by United States Tower Services. |
Materials Worked With | Custom antenna mounts and cable brackets. |
Industry for Use | Public Safety |
Location | Virginia |
Standards Met | Tower Analyzed according to ANSI/TIA-222-G |
Completion Time | 8 Months |